Amber Gas Corridor is a joint initiative of Amber Grid, KN Energies, Conexus Baltic Grid, Elering, Gasgrid Finland and GAZ-SYSTEM, aimed at facilitating efficient and reliable gas transportation between Finland, the Baltic States, Poland and Central & Eastern Europe.Based on existing LNG terminals, gas transmission interconnections and storage facilities, the Corridor provides reliable and flexible gas transportation between Finland, the Baltic States, Poland towards Ukraine. Market participants benefit from diversified supply sources, integrated regional markets and access to gas trading opportunities via EEX and TGE.

▼ How to become a shipper?
  ROUTE 1: INKOO LNGT (FIN)-BALTICCONECTOR (FIN-EST)-KIEMENAI ENTRY (EST-LV)-KIEMENAI EXIT (LV-LT)-SANTAKA (LT-PL)- PL-UA
  ROUTE2: KLAIPĖDA LNGT (LT)-KALIPĖDA ENTRY (LT)-SANTAKA (LT-PL)- PL - UA

Finland

 

Estonia-Latvia Lithuania Poland
         
         
Amber Gas Corridor            
Amber Gas Corridor is a joint initiative of Amber Grid, KN Energies, Conexus Baltic Grid, Elering, Gasgrid Finland and GAZ-SYSTEM, aimed at facilitating efficient and reliable gas transportation between Finland, the Baltic States, Poland and Central & Eastern Europe.Based on existing LNG terminals, gas transmission interconnections and storage facilities, the Corridor provides reliable and flexible gas transportation between Finland, the Baltic States, Poland towards Ukraine.  Market participants benefit from diversified supply sources, integrated regional markets and access to gas trading opportunities via EEX and TGE.            
           
           
           
                     
▼ How to become a shipper?            
                     
  ROUTE 1:  INKOO LNGT (FIN)-BALTICCONECTOR (FIN-EST)-KIEMENAI ENTRY (EST-LV)-KIEMENAI EXIT (LV-LT)-SANTAKA (LT-PL)- PL-UA            
      ROUTE2: KLAIPĖDA LNGT (LT)-KALIPĖDA ENTRY (LT)-SANTAKA (LT-PL)- PL - UA            
  Finland Estonia-Latvia Lithuania Poland            
 
 
     
 
         
   
     
 
 
         
     
   
 
 
ü
           
Sign a Transmission Agreement with the TSO ü ü ü ü            
Agreements - Gasgrid Transmission | Conexus Contracts | Amber Grid Transmission contract | GAZ-SYSTEM            
Application and contract | Elering            
Provide Financial Security /  Deposit ü ü ü ü            
Become an LNG Terminal user (if aplicable) ü   ü              
Terminal services and tariffs - Gasgrid Services and Capacities of the Klaipėda LNG Terminal | KN Energies            
Obtain a Gas Trading Licence (for VTP trades, if applicable)   ü ü            
  Register atNatural Gas Traders' Register VKEKK Licensing / Permissions URE / Gas information package            
Join a Gas Exchange (if trading) European Energy Exchange  TGE commodity exchange            
Access to EEX | EEX TGE - Membership            
Market Information Platform ENTSOG IIP ENTSOG IIP ENTSOG IIP GIIP nedėti          
LNG TERMINAL: GIE IIP            
Comply with Mandatory Gas Stock Requirements (if applicable)   ü            
URE / Zapasy obowiązkowe gazu ziemnego            
Requirements applicable in all countries:                                                                                                                        ✓ Registration in CEREMP (REMIT)                     ✓ ACER Code            
             
Support Contacts customerservice@gasgrid.fi capacity@conexus.lv pardavimai@ambergrid.lt klient@gaz-system.pl            
AS klienditugi@elering.ee            
Regulatory Requirements Legislation and regulation Transmission regulation Rules for the access to the Natural Gas Transmission system Transmission network code            
  Balancing regulation Rules of balancing            
                     
▼ How to book capacity and submit nominations?            
                     
  ROUTE 1:  INKOO LNGT (FIN)-BALTICCONECTOR (FIN-EST)-KIEMENAI ENTRY (EST-LV)-KIEMENAI EXIT (LV-LT)-SANTAKA (LT-PL)- PL-UA        
    ROUTE 2: KLAIPĖDA LNGT (LT)-KALIPĖDA ENTRY (LT)-SANTAKA (LT-PL)-PL - UA        
                     
  Inkoo LNG Entry (FIN) Balticconector (FIN-EST) Kiemenai Exit (LV-LT) Klaipėda ENTRY (LT) Santaka (LT-PL) GCP GAZ-SYSTEM/UA TSO (PL-UA)        
       
Technical capacity 140 GWh/day Published at Entsog transparency platform 82 GWh/d 116.7 GWH/d 58 GWh/d 90,4 GWh/d        
Available Capacity Published at Entsog transparency platform Published at Entsog transparency platform Transmission data | Conexus Open data | Amber Grid Open data | Amber Grid NTS transmission capacity        
Capacity type Firm/ Interuptible Capacity is allocated implicitly based on confirmed nominations and renominations matched between Gasgrid Finland and Elering AS. Double-sided nominations are required. The first D-1 nomination deadline is 15:00 EE(S)T. Firm/ Interuptible Firm/ Interuptible Firm/ Interuptible Firm/ Interruptible        
Capacity products Year → Within-day Year → Within-day Year → Within-day Year → Within-day Year → Within-day        
Capacity allocation method Explicit booking via GASGRID system Capacity is allocated via GSA platform. Part of the technical capacity allocated for implicit allocation via the Exchange Explicit booking via Amber Grid  Capacity is allocated via GSA platform Capacity is allocated via GSA platform        
Where to book capacity Gasgrid Portal Gasgrid Portal GSA Platform Amber Grid Self Service GSA Platform GSA Platform         
Where to submit nominations Gasgrid Portal Submit nominations to both operators Submit nominations to both operators Nominations are submitted via the LNG operator page for customers Submit nominations to both operators:  Submit nominations to both operators:        
  Common Zone Platform Common Zone Platform GAZ-SYSTEM Information Exchange System  GAZ-SYSTEM Information Exchange System         
  Gasgrid Portal Amber Grid Self Service Amber Grid Self Service  UA TSO Information Platform
       
                     
▼LNG Terminal Access            
                     
  ROUTE 1: INKOO LNGT (FIN)-BALTICCONECTOR (FIN-EST)-KIEMENAI ENTRY (EST-LV)-KIEMENAI EXIT (LV-LT)-SANTAKA (LT-PL)- PL-UA ROUTE 2: KLAIPĖDA LNGT (LT)-KALIPĖDA ENTRY (LT)-SANTAKA (LT-PL)-PL TO UA        
  Inkoo LNG Terminal, Finland Klaipėda LNG Terminal, Lithuania        
Terminal Operator Floating LNG Terminal Finland Oy AB KN Energies        
Capacity allocation mechanism Long-term, annual, spot  long-term, annual, spot, reloading and/or biomethane liquefaction        
Capacity products Regasification, reloading, biomethane liquefaction regasification, reloading and/or biomethane liquefaction        
Auction process Allocation invite- allocation request submission - allocation results - contracts signing auction launch - bid submission - allocation results - contracts signing        
Regasification fee 2026 - 2,46 Eur/MWh; 2027 - 1,96 Eur/MWh 2026 - 1,69 Eur / MWh + premium fee; 2027 - 1,82 Eur / MWh + premium fee        
Contacts operations.fltf@gasgrid.fi lngcommerce@kn.lt        
Available Capacity Capacity invites published
Capacity invites published         
Available and allocated capacity updated monthly in the service schedule Available and allocated capacities        
             
▼Route transmission tariffs            
                     
   ▼  Tariffs for 2027 (projected) EUR/ MWh                
Destination Country Direction Monthly product, EUR/MWh Quaterly product, EUR/MWh Yearly product, EUR/MWh            
LITHUANIA-POLAND LNGT (LT) → LT →PL 2,89 2,56 2,33            
LITHUANIA-UKRAINE LNGT (LT) → LT →PL → UA 5,05 4,5 4,1            
FINLAND POLAND LNGT (FI) → EST → LV → LT → PL 3,87 3,41 3,11            
FINLAND UKRAINE LNGT (FI) → EST → LV → LT → PL → UA 6,03 5,36 4,88            
                     
   ▼Tariffs for 2026 EUR/MWH                
Destination Country Direction Monthly product, EUR/MWh Quaterly product, EUR/MWh Yearly product, EUR/MWh            
LITHUANIA-POLAND LNGT (LT) → LT →PL 3,46 3,05 2,79            
LITHUANIA-UKRAINE LNGT (LT) → LT →PL → UA 5,78 5,14 4,69            
FINLAND POLAND LNGT (FI) → EST → LV → LT → PL 4,43 3,91 3,57            
FINLAND UKRAINE LNGT (FI) → EST → LV → LT → PL → UA 6,74 5,99 5,45            
                     
Transmission tariff in Finland Transmission tariffs and service prices - Gasgrid                
Transmission tariff in Estonia Gas network service | Elering                  
Transmission tariff in Latvia Transmission | Conexus                  
Transmission tariff in Lithuania Tariffs and prices | Amber Grid                  
Transmission tariff in Poland NTS Tariff Benefitting from transport routes across Poland                
                     
                     

 

 

 

 

 