Open data
- In this map it is given the actual hourly gas flow in the entrance and exit of a transmission system points - gas metering stations (GMS).
- Gas transmission service is provided after the operator receives a gas transportation order - nomination. Such orders must be submitted every day by system users who have purchased transmission system capacities and intend to use them - to transport gas through the Lithuanian transmission system, including gas transit to Kaliningrad. If nomination is sent for the smaller amount of gas, the transportation service is provided according to the quantities specified in the order.
- The volume of the inlet of gas for transit to Kaliningrad at the Kotlovka GMS often differs from the outlet volume at the Šakiai GMS for technological reasons, balancing the flow and pressure parameters of two different systems. Although hourly gas volumes can fluctuate, physical daily and longer-term gas volumes are delivered to Kaliningrad as they arrive at the Kotlovka GMS for further transit.
-
Measurement units: 1,000,000,000 kWh = 1,000,000 MWh = 1,000 GWh = 1 TWh
- In according with legel requirements, that were in force until 31 December 2014, historical data of capacities and gas flows are published in gas volume units at standart reference conditions: at measurement temperature of +20 °C and the pressure of 101.325 kPa.
- Information about Nominations and Re-nominations submitted by Network Users is available on the ENTSOG Transparency Platform.
- Maintenance works schedule.
Gas flow and capacity calculator
Please select parameters you need:
Period
Please select the start and end dates.
Invalid period: the start date is later than the end date.
Actual information
Please select the information you want to receive.
Points
Please select at least one point.
Format
Data in relevant points of transmission system
No data available
| Date | Technical capacitykWh/day | Available capacitykWh/day | Booked firm and interruptible capacitykWh/day | Capacity reserved for implicit capacity allocation kWh/day | Actual gas flowskWh/day | Notes | Explanation | Other information |
|---|---|---|---|---|---|---|---|---|
Domestic consumption data
Please select parameters you need:
Period
Please select the start and end dates.
Invalid period: the start date is later than the end date.
Actual information
Please select the information you want to receive.
Format
No data available