<div>In accordance with Commission Regulation (EU) 2017/459 of 16 March 2017 establishing a network code on capacity allocation mechanisms in gas transmission systems, at least in each odd-numbered year, transmission system operators shall cooperate in the processes of assessing market demand for incremental capacity and of conducting technical studies for incremental capacity projects.</div>
<div> </div>
<div>The incremental process starts with the demand assessment phase. At the beginning of this phase network users can submit non-binding demand indications.</div>
<div>
<p>Amber Grid announced a non-binding market demand assessment for incremental capacity. At the interconnection point between Lithuania and Latvia and interconnection point between Lithuania and Poland, TSO AB Amber Grid has not received non-binding demand indications for firm capacity for future periods. </p>
</div>
<div> </div>
<div>Incremental capacity assessment report at interconnection point between Lithuania and Latvia may be downloaded <a href="/en/doclib/cfm0b9aygiksf8nvm94uujufzf7x4zqn">here</a>.</div>
<div>Incremental capacity assessment report at interconnection point between Lithuania and Poland may be downloaded <a href="/en/doclib/qwpal4dlwgmtfvb5therpsgkdsjgmxaa">here</a>.</div>